Motorists are advised of changed traffic conditions this week on the New England Highway while construction work is undertaken on the M1 Pacific Motorway extension to Raymond Terrace.
Subscribe now for unlimited access.
$0/
(min cost $0)
or signup to continue reading
The work will require lane closures and temporary speed reductions at the following locations and times:
- . M1 Pacific Motorway northbound lane closure between Black Hill Road and John Renshaw Drive between 8pm and 5am, Monday 27 November to Friday 1 December.
- . New England Highway eastbound lane closure between Quarter Sessions Road and Anderson Drive from 8pm to 5am, Wednesday 29 November to Friday 1 December.
- . New England Highway westbound lane closure from 8pm to 5am, Monday 27 November to Thursday 30 November.
- . Maitland Road westbound lane closure from 8pm to 5am, Friday 1 December. . Maitland Road eastbound lane closure from 8pm to 5am, Monday 27 November to Wednesday 29 November.
- . Pacific Highway southbound lane closure, near Tomago Road between 8pm and 5am, Wednesday 29 November to Friday 1 December.
- . Pacific Hwy northbound lane closure opposite the Hunter Region Botanical Gardens from 8pm to 5am, Monday 27 November to Friday 1 December.
- . Anderson Drive onramp shoulder closure to New England Highway from 7am to 5pm, Monday 27 November to Friday 1 December.
- . M1 southbound lane closure near Lenaghans Drive from 8pm to 5am, Monday 27 November to Tuesday 28 November.
Motorists are advised to allow extra travel time and follow the directions of signs and traffic controllers.
Transport for NSW thanks motorists for their patience during this time. For the latest traffic updates download the Live Traffic NSW app, visit livetraffic.com or call 132 701.
In other news: